Kitchen & Bath Remodels in the Twin Cities
Full-service remodels — design, demo, plumbing, electrical, cabinets, counters, tile, paint, and final inspection. Single point of accountability and a fixed-price contract before work starts.
Kitchen pricing (Twin Cities, mid-2026)
| Tier | Investment | Includes |
|---|---|---|
| Refresh | $15,000 – $30,000 | Paint cabinets, new counters, new appliances, new lighting, same layout |
| Mid-range | $35,000 – $70,000 | New semi-custom cabinets, quartz counters, tile backsplash, new appliances, new flooring |
| High-end | $80,000 – $150,000+ | Custom cabinets, layout changes, premium appliances (Sub-Zero/Wolf), high-end finishes |
Bathroom pricing
| Tier | Investment |
|---|---|
| Powder room refresh | $5,000 – $12,000 |
| Hall bath (full remodel) | $15,000 – $30,000 |
| Primary suite remodel | $30,000 – $75,000+ |
Process
- Design consultation (free) — measure, scope, budget alignment
- Design & selections ($1,500–$5,000, credited if you proceed) — plans, 3D renderings, finish selections
- Fixed-price contract — line-item proposal, no surprises
- Permit & demo — week 1
- Rough-ins (plumbing, electrical, HVAC) — weeks 1–2
- Inspections — every trade
- Cabinets, counters, tile, finishes — weeks 3–6
- Final inspection & punch list — week 6–8
Typical Twin Cities mid-range kitchen: 6–8 weeks. Bathroom: 3–5 weeks.
Permits & inspections
Required in every Twin Cities city for plumbing, electrical, and structural changes. We pull permits, schedule inspections, and meet inspectors on-site.
What's included
- Free, no-pressure estimate
- Licensed & fully insured crew
- Cleanup included — we leave it spotless
- Same-day or scheduled service
- Written quote, fair pricing
- 24/7 emergency response
FAQ
How long does a kitchen remodel take?
6–8 weeks typical for a mid-range Twin Cities remodel from demo to final inspection. Custom cabinets can extend lead time 4–6 weeks before demo starts.
What does a kitchen remodel cost in Minneapolis?
Mid-range runs $35,000–$70,000 (semi-custom cabinets, quartz, new appliances). Refreshes start around $15,000; high-end customs $80,000+.
Do you handle the design?
Yes — in-house design with 3D renderings. The design fee is credited toward the project if you proceed.
Can we live in the house during a kitchen remodel?
Yes, most homeowners do. We set up a temporary kitchen (microwave, fridge, sink in laundry/garage) and contain dust with zip walls and HEPA filtration.
Do you pull permits?
Always. Plumbing, electrical, and structural changes all require permits in Twin Cities cities. Permits and inspections are included in your contract price.
What's the ROI on a kitchen remodel?
Mid-range kitchen remodels in the Twin Cities recoup 70–80% at resale per Remodeling Magazine's 2025 Cost vs. Value report — and dramatically improve daily quality of life.
Related cost guide
Kitchen Remodel Cost in the Twin Cities
Real Twin Cities pricing — what you should expect to pay in 2026.
Read the guideKitchen & Bath Remodels near you
We cover 74+ Twin Cities cities. Pick yours: